
Water resources planning
and management
Highways, roads
and access
Singular buildings
and sustainable architecture
CUSTOMER: EGMASA
CONTRACT: Project and Site Management
DATE: 2007
BUDGET: 11.778.907,09 €
This project consists of resolving the problem presented by insufficient vehiculation of existing pipelines, by replacing the network and increasing the pump capacity.
The new pipe consists of two sections, both made of 800 mm ductile cast iron one running from the current pump at the Sierra Boyera Purification Plant to a new tank in Cabezas Gordas and another from the second pump to the tanks in Cuartanero, in addition to the installation of three new tanks (Sierra Boyera, Cabezas Gordas and Cuartanero)
New 60,000 m3 reservoir at the drinking water treatment plant, Villa Azul, Cordoba
Read more...Extension to La Golondrina wastewater treatment plant, Cordoba
Read more...Building the tramway between Chiclana de la Frontera and San Fernando. Section: Chiclana de la Frontera - Caño zurraque. Urban subsection
Read more...