Water resources planning
and management

Highways, roads
and access

Singular buildings
and sustainable architecture


> Home > Projects > Civil engineering > Featured Projects > Extension to La Golondrina wastewater treatment plant, Cordoba

Civil engineering > 

Featured Projects

Extension to La Golondrina wastewater treatment plant, Cordoba

CUSTOMER: EGMASA
CONTRACT: Project Management (UTE INGESA – CEMOSA)
DATE: 2011
BUDGET: 5.794.771,00 €


This consists of the extension of the main wastewater treatment plant in the city of Córdoba, which uses an extended aeration system with activated sludge.  The project consists of four new lines in order to increase the flow of wastewater for treatment by 49,000 m3/day, and catering for a population of 130,000.

The key elements of the project include the construction of two new main decanters, four new aeration lagoons, two new secondary decanters, the replacement of the four existing centrifuges for ones with a greater capacity, and a new layout for the sludge lines, fitting new sludge and polyelectrolyte pumps.


see map

Related projects
  • Access node at the future Science and Technology Park, Cordoba

    Read more...
  • Renewing water mains pipes in the northern region of the Cordoba province

    Read more...
  • New 60,000 m3 reservoir at the drinking water treatment plant, Villa Azul, Cordoba

    Read more...